Tuesday, September 18, 2007

Tuesday, September 18th, 2007

Construction personnel have leveled off the property where the new structure will sit, and work has begun on the foundation. Shown below is a shot of the leveled area.



To the north of the building site will be a small drainage pond, where water run-off will spill into, and alleviate excess drainage into the ditch behind the property. This is another aspect of the "green" construction efforts employed in this project.



The far end of the next three shots shows the spot where the barn will be moved to, from its present location. Harry Blackmon walks the site frequently to check things over and ensure the project is progressing expeditiously!









The trenches have been dug around part of the property, into which concrete will be poured for the foundation.



Harry stands at the front of where the new gymnasium will be constructed.